Assignment: Overview As we have learned though our readings and discussions in this course, Lean is used to…

 
 
Value Stream Mapping and Analysis  Due: Sunday, Midnight of Week 3 (10% of course grade)
 
 

As we have learned though our readings and discussions in this course, Lean is used to improve operations and processes in services, manufacturing, healthcare, government and other sectors of the economy.  A core tool in Lean is Value Stream Mapping.  This tool helps us to visualize complex work systems (including material and information flows) so we can better address disconnects, redundancies, and gaps in how work gets done between the beginning and end of a process.
 
•       The primary type of value stream is one in which a product or service is requested by (and delivered to) an external customer.  Examples include: request to receipt, order to delivery, and quote to cash.  
 
•       Other value streams support the delivery of value, called value-enabling or support value streams.  Examples include recruiting, onboarding, IT support, and annual budgeting.
 
Since it is nearly always a mistake to initiate changes without have a clear picture of how the system is currently functioning, we are beginning our Course Project with the creation and analysis of a Value Stream Map.
 
 
 
 

 
For the Assignment, select a value stream in your organization that can benefit from analysis and improvement.  As noted previously, the value stream (or end-to-end process) selected does not need to be overly large or complex.  Select something which has the potential for meaningful improvement, but which is manageable within the scope of this assignment. 
 
1)    Develop a current state Value Stream Map of your selected value stream.  Show the customer demand rate (or Takt), information flow, work flow, and summary timeline on the map.  
 
2)    Document key metrics for each process block:  
•       Process time (PT)
•       Lead time (LT)
•       Percent Complete and Accurate (%C&A)
•       Include any other appropriate metrics, such as number of operators, changeover time or setup time, batch size, and % uptime.
 
3)    Calculate the current state summary metrics:
•       Total lead time (Total LT)
•       Total process time (Total PT)
•       Activity Ratio (AR)
•       Rolled Percent Complete and Accurate (Rolled %C&A)
 
4)    Describe the current state of the value stream and highlight any performance deficiencies and challenges, such as delays, excessive WIP, bottlenecks, capacity and workload imbalances, rework, poor quality yields, long lead times, and other operational issues. 
 
 

Your work may be submitted in either Word or PowerPoint.  
•       Since you will need to include a diagram to map the value stream for #1, you should select whatever software you are most comfortable working with.  Value stream process maps can easily be created in PowerPoint, but are more difficult to execute well in Word.  You should consider using https://www.draw.io/ which is a free web-based tool for drawing flowcharts.  Instructions for use are posted in the Course Documents section in Blackboard.  You may also use other software such as Visio if you prefer, but this is not necessary.   Note: If you do use a different mapping software and experience difficulties uploading it into Blackboard, convert your map to a PDF or JPG and paste it into Word or PPT before submitting. 
•       For #2, the information for each process block should be on the value stream map.  For #3, it can be on the map or in tabular form.  Show how the summary metrics are calculated.  Keep your written answers brief and to the point.  Accuracy is what matters. This should take no more than one page. There are no additional points for overly elaborate responses.
•       For #4, a thorough response should take no more than one page.
 
 
 
 
 
 
 

 

 
CRITERIA

 
Unsatisfactory

 
Low Pass

 
Pass

 
High Pass

 
Honors

Develop a current state Value Stream Map of your selected value stream. 
Show the customer demand rate (or Takt), information flow, work flow, and summary timeline on the map.
 
Weight: 25%

 
No value stream map included and/or incomplete
or inaccurate use of
mapping conventions or symbols.

 
Value stream map shows the basics of the work flow, and process blocks.

 
Value stream map shows information flow, work flow, and process blocks. 

 
Value stream map shows customer demand rate (or Takt), information flow, work flow and process blocks. 

 
Value stream map gives a complete, detailed, and accurate picture of the current state, showing customer demand rate (or Takt), information flow, work flow and summary timeline.
 

Document key metrics for each process block: 
 
Process time (PT)
Lead time (LT)
Percent Complete and
Accurate (%C&A)
 
Include any other appropriate metrics such as number of operators, changeover time or setup time, batch size, and % uptime.
 
Weight: 25%

 
No key metrics included and/or metrics are incorrect.

 
At least one key metric documented for all process blocks.

 
At least 2 key metrics calculated and documented
correctly for all process blocks.
 

 
All key metrics calculated and documented
correctly for all process blocks.
 

 
All key metrics calculated and documented
correctly for all process blocks, and relevant additional metrics are included.

Calculate the current state summary metrics: 
 
Total lead time (Total LT)
 
Total process time (Total
PT)
Activity Ratio (AR)
 
Rolled Percent Complete and Accurate (Rolled
%C&A)
 
Weight: 25%

 
No key metrics are calculated correctly.

 
At least one key metric is calculated correctly.

 
At least two key metrics are calculated correctly.

 
Three key metrics are calculated correctly

 
All four key metrics are calculated correctly.

Describe the current state of the value stream and highlight any performance deficiencies and challenges – such as delays, excessive WIP, bottlenecks, capacity and workload imbalances, rework, poor yields, quality, lead time, and other
operational issues
 
Weight: 25%

 
Description of the current state of the value stream is missing or lacking accurate details.

 
Describes the current state of the value stream but without sufficient detail.

 
Satisfactory description of the current state of the value stream, with sufficient detail. 

 
Complete, correct and accurate description of the current state of the value stream, with good use of relevant metrics and performance levels.

 
Exemplary description of the current state of the value stream, with excellent use of relevant metrics
and performance
levels, 

 

QUALITY: 100% ORIGINAL PAPERNO PLAGIARISM - CUSTOM PAPER

Recent Completed and delivered Papers

# Topic title Subject Area Academic Level Pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min